Projects completed with NEERI & other organisations:
Oil & Gas (Hydrocarbon) Projects:
- REIA proposed Isomerization & Mixed Xylene Refinery project Rapid Environmental Impact Assessment proposed Isomerization & Mixed Xylene projects at MRPL, Mangalore
- REIA for existing project in refining complex Environmental Related studies for existing project in Refining complex at Motikhavadi, Jamnagar, Gujarat (Reliance Petroleum Limited) Sponsor: RPL, Mumbai
- Environmental Impact and Risk Assessment: HPCL Refinery Clean Fuel Project at Vizag. Environmental Impact and Risk Assessment for clean fuel Project proposed by HPCL at Vaizag Refinery Sponsor: HPCL, Vaizag
- Offshore Water sampling and Analysis for ONGC, Offshore Water sampling and Analysis for ONGC, gulf of cambhat, Gujarat, India
- REIA forONGC AN-OSN Offshore projects Rapid Environmental Impact Assessment for Seismic Survey and Exploratory drilling by ONGC AN-OSN Offshore Water and sediment sampling at Andaman and Nicobar Islands, IndiaREIA for CBM Exploration and Development REIA for coal Bed Methane Exploration and Development project at Wardha valley Block (Mah) in Satpura basin-ONGC India. Reconnaissance and verification of Baseline developed by Third Party of MoEF-Govt of India.
- REIA for CBM Exploration and Development REIA for coal Bed Methane Exploration and Development project at Wardha valley Block (Mah) in Satpura basin-ONGC India. Reconnaissance & verification of Baseline developed by Third Party of MoEF-Govt of India.
- EIA for Offshore Block at Andaman Sea, East Coast Environmental Impact Assessment of Proposed Exploratory Drilling in Offshore Block AN – DWN – 2003/1 under NELP – V in Andaman Sea, East Coast of India (ONGC)
- REIA for NELP Block in Cambay Basin-ONGC 2005-01Rapid Environmental Impact Assessment for Seismic Survey and Exploratory drilling in NELP Block CB-ONN-2001/1 in Cambay basin, Gujarat. (Kehda district); EIA Baseline, MoEF REIA Report, Presentation preparation and Technical Query.
- Environmental Audit of ONGC Effluent Treatment Plant: Environmental Audit of ONGC Effluent Treatment Plants Sponsor: Oil and Natural Gas Corporation Ltd, Mumbai
- Environmental Audit of Onshore Effluent treatment Environmental Audit of Onshore Effluent treatment Plant at Nazira Asset, Assam
- Rapid Risk Assessment for NELP exploration Rapid Risk Assessment for Exploratory Drilling Proposed in Offshore NELP Block KK-OSN-2001/3 in West Coast of India (ONGC)
Power plants & infrastructure projects:
EIA for 2×500 MW Coal based Thermal Power station EIA for proposed expansion of (2×500 MW) Coal based Thermal Power station at Koradi, Nagpur district, MAH. India
EIA for 2×500 MW Coal based Thermal Power station EIA for proposed expansion of (2×500 MW) Coal based Thermal Power station at Koradi, Nagpur district, MAH. India
Thermal Power Plant at Parli EIA for proposed expansion of (2x 500 MW) Coal based Thermal Power station at Parli Maharashtra.
Thermal Power at Bhusawal EIA for proposed expansion of (2×500 MW) Coal based Thermal Power station at Bhusawal Maharashtra.
Thermal Power Plant Khaperkeda EIA for proposed expansion of (2×500 MW) Coal based Thermal Power Plant at Khaperkheda, Nagpur district, MAH.
Thermal Power Plant Chandrapur Rapid Environmental Impact Assessment for Proposed (4 x 500 MW) Expansion of Coal Based Thermal Power Project at Chandrapur, District Chandrapur, Maharashtra (Maharashtra State Power Generation Company Ltd., Mumbai)
Thermal power plant at Uran EIA for proposed expansion of (2×500 MW) Gas based Thermal Power station at Uran Maharashtra.
PEIA for Lavasa City Corporation, Pune, Maharashtra Post Project Rapid Environmental Monitoring for Lavasa City Corporation, Pune, Maharashtra
REIA for Airport at Amby Valley Sahara Lake City Rapid Environmental Impact Assessment for Airport at Amby Valley Sahara Lake City near Pune, Maharashtra
List Of Corporate Projects Worked at Site:
Punjab Hazardous Waste Management Project (PWMP), Derabassi, Chandigarh:
*PWMP at for Hazardous Waste Landfill Post Project Monitoring
*Environmental Lab. Setup as per govt. guidelines for daily Haz Waste Analysis
*Form V, Water Cess, Compliance report presentation to Ch.PCB
Sahara Infrastructure India, Corporate, Bangalore:
*EIA clearances from Ministry of Environment and Forest
*Consent to Establish and Operate from (including renewal) State Pollution Control Boards
*Environmental Management Plan- Preparation and Execution at site
*Horticulture development, STP, WTP
*Audit of Site as per EIA guidelines for reconnaissance and EMS Certification (ISO: 14000)
*Report Preparation with Analysis: Detailed Project Report and EIA Reports, Stack emission Monitoring for Generator
KSK Energy Ltd-Wardha Power Company Limited [4×135] MW Warora:
*Consent for Establish and Operations for Unit II, III and IV, Form V, Water Cess
*Green Belt Development for Emission Control and Horticulture
*Environmental Laboratory Development and Operation for Stack Emission with FGCs
*Various Environmental Reports like Compliance monitoring reports , CESS Report, Fly Ash Utilization CEA Report
*ESP and Bag Filter Management and Efficiency test by Emission Analytics method
Cairn India Ltd. Barmer Rajasthan:
*Hazardous Waste Landfill Management, Analytical Laboratory Operations; Environmental Monitoring
*Green Belt Development & Maintenance; STP Management, Effluent Management from filteration process.
*Various Environmental Reports viz., Water Cess, Six monthly EC compliance, Yearly Environmental Statement Form-V and IV for Hazardous Waste; Monthly Environmental Sampling Report from Third party and Liaison with RSPCB
CHDOC Power Plant Operation for Talwandi Power Plant Ltd. (TSPL) Punjab:
*Hazardous Waste Landfill Management, Analytical Laboratory Operations; Environmental Monitoring
*Green Belt Development and Maintenance
*Zero Discharge System (ZDS), ETP and STP Project Commissioning and Defect s Identifications for Operation
JSW Energy Ltd.- Raj West Power Ltd :
*Operation of Effluent Treatment Plant, Sewage Treatment Plant with UF/RO;
*Green Belt Development with Horticulture specialization for Orchards Development
*Various Environmental Reports viz., Water Cess, Six monthly EC compliance, Yearly Environmental Statement Form-V and IV for Hazardous Waste; Monthly Environmental Sampling Report from Third party and Liaison with RSPCB